Instrumentation of a 50-ft (15.2-m) Deep Braced Excavation /

An extensive instrumentation program was carried out over a 6-month period on a 50-ft (15.2-m) deep braced cut in dense sand. The temporary bracing system consisted of interlocking steel sheet piles (Larssen type IIIN), wales, and struts from wide-flange steel sections. The soil consisted of fine, u...

Full description

Bibliographic Details
Main Author: Bauer, GE (Author)
Corporate Authors: ASTM International, American Society for Testing and Materials
Format: Book
Language:English
Published: West Conshohocken, Pa. : ASTM International, 1975
Subjects:

Internet

This item is not available through BorrowDirect. Please contact your institution’s interlibrary loan office for further assistance.