Stakeholder characteristics in rapid acquisition /

The number of Joint Urgent Operational Needs has exploded with the Global War on Terror and the campaigns in Iraq and Afghanistan. The challenge to smaller urgent programs is the programs are not large enough to obtain top priority for all stakeholders. Even if the entire stakeholder landscape agree...

Full description

Bibliographic Details
Main Author: Meyer, Michael J., S.M
Corporate Author: Massachusetts Institute of Technology Engineering Systems Division
Format: Thesis Book
Language:English
Published: c2013
LEADER 02163ntm a2200289Ka 4500
001 71cbf000-7c66-4268-bb0a-b9b8147c9030
005 20240829000000.0
008 130624s2013 xx a bm 000 0 eng d
035 |a (MCM)002147545MIT01 
035 |a (OCoLC)849903021 
040 |a MYG  |c MYG  |d MYG 
049 |a MYGG 
099 |a Thesis ESD 2013 S.M 
100 1 |a Meyer, Michael J.,  |c S.M  |u Massachusetts Institute of Technology. 
245 1 0 |a Stakeholder characteristics in rapid acquisition /  |c by Michael J. Meyer 
260 |c c2013 
300 |a 108 p. :  |b ill. (chiefly col.) ;  |c 29 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Cataloged from PDF version of thesis 
502 |b S.M  |c Massachusetts Institute of Technology, Engineering Systems Division  |d 2013 
504 |a Includes bibliographical references (p. 104-108) 
520 3 |a The number of Joint Urgent Operational Needs has exploded with the Global War on Terror and the campaigns in Iraq and Afghanistan. The challenge to smaller urgent programs is the programs are not large enough to obtain top priority for all stakeholders. Even if the entire stakeholder landscape agreed to the urgency of the requirement not all stakeholders can or will increase their urgency the same amount. Four critical stakeholder attributes are examined in rapid acquisition: Cachet, Advocacy, Operational Need and Optempo. A method of dynamic tracking of these four stakeholder attributes is presented along with data from three rapid acquisition programs confirming the importance of Cachet, Advocacy and Operational Need to the success of rapid acquisition programs 
710 2 |a Massachusetts Institute of Technology  |b Engineering Systems Division. 
999 1 0 |i 71cbf000-7c66-4268-bb0a-b9b8147c9030  |l 990021475450106761  |s US-MCM  |m stakeholder_characteristics_in_rapid_acquisition___________________________2013____________t________________________________________meyer__michael_j___________________p 
999 1 1 |l 990021475450106761  |s ISIL:US-MCM  |t BKS  |a ARC NOLN3  |b 39080036572201  |c THESIS Thesis ESD 2013 S.M.  |d 8  |x BOOK  |y 23510263430006761  |p UNLOANABLE